August 2023:
Over the past few weeks, construction activities have progressed steadily. To kick off the month, the construction team began erecting structural steel columns and installing steel roof joists. They also made progress by installing conduit for light poles and irrigation sleeves.
The momentum continued while the team installed wind bracing, which was securely welded into place. Additionally, perimeter angles were installed above the joists in preparation for the upcoming roof decking.
By the third week of August, significant milestones were achieved. The installation of the joists was successfully completed, accompanied by the final welding of all joists and the proper placement of wind bracing. Another notable achievement was the installation of a gas line by Centerpoint. The team also embarked on preparing the subgrade for paving.
As the construction timeline progresses to 8/28, more significant tasks will be accomplished. The installation of roof decking will be initiated and completed. Furthermore, the temporary braces will be removed from tilt walls, and the installation of the steel joists for the second-floor mezzanine will commence. The team strategically set drains in production areas, preparing for the impending concrete floor pour.